151 / 2013-03-20 09:42:06
Research On Ground Subsidence In Shield Tunneling Construction In Advanced Model
Ground Subsidence, Shield Tunneling Construction, Advanced Model of elasto-plastic, FLAC3D
Abstract Accepted
The paper which combined with the monitoring data of Shenzhen subway shield project, modified the elastic and plastic model, and applied FLAC3D software to compare the diffences between the results. Besides, Based on the advanced model, the paper analysed the project’s largest settlement and provided the shield construction with optimized control measures.
Important Date
  • Conference Date

    Oct 16

    2013

    to

    Oct 18

    2013

  • May 01 2015

    Draft paper submission deadline

  • May 01 2015

    Early Bird Registration

  • May 15 2015

    Contribution Submission Deadline

  • Jun 09 2015

    Registration deadline

Sponsored By
American Society of Civil Engineers