80 / 2021-11-30 15:49:13
Application of long-distance power supply liquid in gangue filling working face(ERESD 2022)
Ganggue backfilling face,,Remote supply,,Long-distance feeding
Draft Accepted
山军 田 / 中天合创能源有限责任公司
             The waste filling working face can effectively solve the problem of Environmental Protection of waste rock produced in the production process of coal mine, the safety problem caused by frequent pulling and shifting equipment trains can be effectively solved by using the way of long-distance power supply and liquid distribution. Taking the successful application of long-distance power supply and liquid supply in CT201 gangue filling working face in Zhongtianhechuang coal mine as an example, the total voltage drop at the start of the maximum power equipment in the working face is calculated, the actual starting pressure drop is used to verify the design, and the pump station and the long-distance liquid supply system are described, the feasibility of long-distance liquid supply is proved by calculating the flow demand of pump station and the total pressure drop of long-distance liquid supply and return pipeline, monorail crane and rubber hose between frames. The project summarized a set of relatively mature gangue filling working face’s long-distance power supply liquid application experience.

 
Important Date
  • Conference Date

    May 26

    2022

    to

    May 27

    2022

  • May 03 2022

    Draft paper submission deadline

  • May 26 2022

    Contribution Submission Deadline

  • May 28 2022

    Registration deadline

Sponsored By
China University of Mining and Technology
Contact Information