446 / 2024-05-07 14:50:25
Considering risk profile in engineering projects evaluation towards sustainable resources management
risk profile in engineering projects evaluation
Abstract Accepted
Aldin Ardian / Universitas Pembangunan Nasional “Veteran” Yogyakarta, Department of Mining Engineering, Jalan Ring Road Utara, Yogyakarta, 55283, Indonesia
Engineering projects face risks over time. The risks generally may come from financial, technical, and social aspects. Given that the risks cannot be eliminated, considering the risks in the project evaluation is urgently needed. One common technique to evaluate engineering projects is through discounted cash flow where Net Present Value (NPV) is widely used. However, the existing NPV assumes the risks are transformed into one single number (i.e., discount rate). This paper discusses how the risks may affect a project economically and how we may benefit the proposed approach towards sustainability in the industry. The financial risk is quantified by weighted average cost of capital (WACC) model, the technical and social risk is assumed as a cost that is deducted from cash flow and modeled through probability concept. The proposed approach enhances the traditional DCF technique. Eventually, the sustainability of the mineral project can be achieved through managing the resources economically.
Important Date
  • Conference Date

    May 29

    2024

    to

    Jun 01

    2024

  • May 08 2024

    Draft paper submission deadline

Sponsored By
China University of Mining and Technology