Research and Design on walking device for 500kV transmission line 4-bundle conductors
inspection; walking device; climbing obstacle; four bundled conductors
Draft Accepted
余 勇 / 国网安徽省电力公司
刘 林 / 国网安徽省电力公司
For the labor-intensive, low work efficiency, greater risk and other issues of human traces for 500kV transmission line inspection, a new walking device for 500kV transmission line four bundled conductors was proposed. This walking device adopted battery as a power source, was suitable for large span transmission lines, which can automatically span spacers, linear hanging string and shockproof hammer. Described the design and function of walking devices in detail, and finally introduced the field trial. The test results showed that the walking device could achieve wire walking requirements and design standards.
Important Date
  • Conference Date

    May 21

    2016

    to

    May 22

    2016

  • Oct 30 2015

    Early Bird Registration

  • Mar 21 2016

    Draft paper submission deadline

  • Apr 01 2016

    Draft Paper Acceptance Notification

  • Apr 10 2016

    Final Paper Deadline

  • May 22 2016

    Registration deadline

Sponsored By
亚利桑那州立大学
查尔斯特大学
重庆环球联合科学技术研究院
韦洛尔理工大学
阿尔托大学
Contact Information