835 / 2019-04-29 21:56:48
Misoperation Analysis and Preventive Measures of 500 kV Reactor Protection
Reactor protection; Secondary circuit; Misoperation analysis; Preventive measures
Draft Accepted
This paper introduces the process of checking, analyzing and dealing with the causes of maloperation of the first set protection of 500 kV reactor in a substation.By checking the secondary circuit of 500 kV reactor protection for power outage, it is analyzed that the main cause of reactor protection malfunction is that the cable core of the current circuit of the first set protection is damaged at the secondary junction box of TA of the high voltage bushing, which causes the induction current to enter in series, and causes the abnormal sampling of the first set of protection B phase, and causes the protection outlet action.Aiming at the existing problems, we give the corresponding treatment methods and preventive measures.
Important Date
  • Conference Date

    Oct 21

    2019

    to

    Oct 24

    2019

  • Oct 13 2019

    Abstract Notification of Acceptance

  • Oct 13 2019

    Draft paper submission deadline

  • Oct 14 2019

    Draft Paper Acceptance Notification

  • Oct 24 2019

    Registration deadline

  • Oct 29 2019

    Final Paper Deadline

Organized By
Xi'an Jiaotong University
Contact Information