Realization of Sequential Control Function Based on Bay Level Equipment in Smart Substation
Smart substation; Bay level equipment; Virtual loop; Configuration; Sequential control
Draft Accepted
In view of the problem of low reliability and automation of advanced application functions such as sequential control in smart substation, the logic configuration mode of sequential control is analyzed based on the principle of logic virtual circuit of bay level equipment in smart substation, and the realization of sequential control function based on bay level equipment is proposed. This method improves the operational reliability and configuration flexibility of sequential control, and fundamentally solves the technical application problem, so as to improve the intelligent level of power grid.
Important Date
  • Conference Date

    Oct 21

    2019

    to

    Oct 24

    2019

  • Oct 13 2019

    Abstract Notification of Acceptance

  • Oct 13 2019

    Draft paper submission deadline

  • Oct 14 2019

    Draft Paper Acceptance Notification

  • Oct 24 2019

    Registration deadline

  • Oct 29 2019

    Final Paper Deadline

Organized By
Xi'an Jiaotong University
Contact Information